The Beta Group provided the Geotechnical Investigation for the New Orleans Ernest N. Morial Convention Center (NOENMCC) Capital Improvement Plan (CIP), including the addition of a third level with flexible, multi-purpose space that has a dramatic view of the Mississippi River. The investigation consisted of six (6) soil borings, five (5) of which were located inside of the existing facility. The soil test borings were drilled utilizing a truck mounted drill rig at the designated locations. Upon completion of the drilling activities, the boreholes were backfilled with auger cuttings (soil) and high-strength concrete as per LADOTD requirements.
Project Details
- Location : New Orleans, LA