Severn Avenue: Veterans – W. Esplanade

Project description: Removal and replacement of roadway, sidewalks, ADA ramps, pedestrian crosswalks, and the installation of cross signals. This project is part of the STIP (Statewide Transportation Improvement Program). The goal of this project is to provide better and safer means of travel for pedestrians due to the increased traffic in the area.

Services provided: The Beta Group provided concrete inspections, soils testing and compaction testing, and vibration monitoring. TBG is serving as one of two testing laboratories on this project providing construction materials testing services. This project began in 2019 and is nearing completion in 2023.

Project Details

  • Location : New Orleans, LA